Bosch Error Code 620 Fix & Diagnostic Guide

Auxiliary Charging Port Communication Timeout — Smart System / Performance CX / Active Line

Severity: Informational / Warning • Difficulty: 10-min Workshop • Voltage Target: 5.0V +/- 0.15V DC

Fault Symptoms & Root Cause

Symptoms: DualBattery setup: Frame battery charges but second battery does not.

Primary Cause: Y-cable CAN-bus splitter line broken or plug corroded.

Step-by-Step DIY Diagnostic & Repair Protocol

  1. Inspect 620 electrical harness connectors for bent pins, water droplets, or corrosion.
  2. Cycle bike power completely: hold power button for 10 seconds to discharge system bus.
  3. Check 5V DC reference voltage at diagnostic port using digital multimeter.
  4. Ensure eBike Flow App has installed latest firmware updates across all modules.

Multimeter Testing & Bench Specs

Multimeter Test Procedure: Check 5V DC between red power pin and black ground pin at sensor harness. Must measure steady 4.85V to 5.15V DC. Check signal line with multimeter on diode check mode.

Required Diagnostic Tools: Digital Multimeter & Precision Hex/Torx Set

Wiring Pinout & Expected DC Values

Pin Function Target Voltage / Signal Spec
Pin Pin 1 (Red) VCC Logic Power 5.0V +/- 0.15V DC
Pin Pin 2 (Black) Ground Reference 0.0V DC Ground
Pin Pin 3 (Orange/White) CAN-High / Data Out 2.3V - 2.7V DC
Pin Pin 4 (Yellow/Blue) CAN-Low / Signal In 2.1V - 2.5V DC

Frequently Asked Questions

What does Bosch Error 620 mean?

Auxiliary Charging Port Communication Timeout on Smart System / Performance CX / Active Line. Symptoms include DualBattery setup: Frame battery charges but second battery does not.. The root fault is: Y-cable CAN-bus splitter line broken or plug corroded.

How do I diagnose and fix Bosch Error 620?

Inspect 620 electrical harness connectors for bent pins, water droplets, or corrosion. Cycle bike power completely: hold power button for 10 seconds to discharge system bus. Check 5V DC reference voltage at diagnostic port using digital multimeter. Ensure eBike Flow App has installed latest firmware updates across all modules.

What multimeter voltage should I read during testing?

Target voltage is 5.0V +/- 0.15V DC. Follow the test procedure: Check 5V DC between red power pin and black ground pin at sensor harness. Must measure steady 4.85V to 5.15V DC. Check signal line with multimeter on diode check mode.

Other Bosch Error Codes

Bosch 503
Speed Sensor Signal Failure
Bosch 500 / 500111
Internal Drive Unit Hardware General Error (Smart System: 500111)
Bosch 510
Internal Drive Unit Torque / Sensor Plausibility Fault
Bosch 504
Tuning Dongle / Tamper Algorithm Lockout
Bosch 530
Battery Management System (BMS) Connection Fault
Bosch 540
Drive Unit Internal Temperature Cut-Off / Stator Overheat